A workload disposition register connects a proposed migration path to its reason, dependency constraints and accountable decision owner. Its value is not the number of completed rows: it is whether another reviewer can understand why a move should happen and what must be resolved first.
Record the constraint, then the path
Start with the problem being addressed: an unsupported runtime, a capacity constraint, difficult maintenance or a dependency that is changing. “Move to cloud” is an action, not a sufficient rationale. Record what would remain unresolved if the workload were rehosted without application changes. A workload can reasonably remain in place when movement does not solve its actual constraint; give that decision a review trigger and maintenance owner.
Make dependencies reviewable
Give each entry an owner, proposed path, known interfaces, unresolved assumptions and the evidence needed for approval. Separate a shared database or identity dependency from a team's preference to release at the same time. Record interfaces that cross supplier boundaries. An application inventory is useful input, but is not itself a dependency map.
Worked decision record, not a delivered project
A planning team might discover that an application can move before its reporting system only if the temporary connection is authorized and acceptable. Its register should identify the connection's owner, constraints and expiry condition. If these are unknown, mark the dependency unresolved rather than declaring the workload ready. This is a technical decision-support example, not XIVTech client work or a statement about a particular city.
Use the register to choose a wave
Group workloads by dependencies and enabling work. A small first wave is useful only when its lessons transfer to later changes; record where they do not. Accepting the register authorizes a planning decision, not data correctness, production cutover or continuing support. Those need separate acceptance rules.
Continue the service decision